Rigging Authorization and Overhead Load Verification
Controls who may rig overhead loads in the venue and how every point is verified against structural limits before anything flies.
Why This Matters
Everything hung above a crowd is a life-safety decision, and rigging failures are catastrophic, public, and unforgiving of shortcuts. HIG venues never negotiate rigging competence: only licensed, credentialed riggers touch points, and the structural drawing — not tour habit — sets the limit.
Continue to the complete procedure
You’re viewing the public overview. Sign in or create a free Alveary account, then use an available monthly premium unlock to continue with the step-by-step procedure, decision points, escalation path, and Leadership Lens.
This is a premium standard. A free account includes all 10 Starter Shelf standards, plus one premium standard each month; Membership opens all 1,314.